"The loadout went exceptionally well and Technip had no problems to report. They felt that this was probably one of the better de-mob / mob that has been undertaken at Shepherd Offshore"
|
|
|
 |
| |
|
| |
Project :
Shell Curlew C
Workscope :
Demob / Mob / Spooling 1 x umbilical
Location :
Under Radius Of Dockside Crane - Shepherd Offshore – Offshore Technology Park – Walker – Newcastle
Shepherd Offshore Services Provided :
Demob Hotworks & Lifting / Set up spooling operations / Loading setting up Aquatic Towers on vessel / Heavy & Abnormal lifting services / Mobile crane plant hire / Material handling solutions reference spooling / Fabrications services / Storage solutions / Mob fast turnaround.
|
|
Agent :
Duco / Technip / Shell
Vessel:
Wellservicer Draft 6.5m to 7.25m / Length 111.4m
Date / Time Arrival :
28/5/08 10:15hrs
Date / Time Departure :
30/5/09 10:30hrs
|
Shepherd Offshore Comments:
Shepherd Offshore ensured a well planned, safe and efficient load out was concluded with out incident and on schedule. The client issued a special thanks to the company’s Lifting Supervision for their “efforts and cooperativeness through out” |
|
|