"The J963 carousel load out route and pipe transports from reels to vessel carousel are now complete. I would like to express my thanks to everyone concerned for their assistance and efforts during some frustrating and challenging times on this load out."
|
|
|
 |
| |
|
| |
Project :
J963-2 Maersk Lochranza
Workscope :
Spooling 3 x Flow lines & several short jumpers / Red Load out frame & Metering skid.
Location :
North of 250Ton SWL Dockside Crane – Shepherd Offshore – Offshore Technology Park – Walker - Newcastle
Shepherd Offshore Services Provided :
Heavy & Abnormal lifting services / Internal transportation / Mobile crane plant hire / Material handling solutions reference spooling / Fabrications services / Storage solutions / Demob fast turnaround.
|
|
Agent :
Wellstream / Acergy / Maersk
Vessel:
Skandi Acergy Draft 7.2m
Date / Time Arrival :
27/8/09 08:00hrs
Date / Time Departure :
5/9/09 15:30hrs
|
|
|