DOWNLOAD BROCHURE
VIEW OUR CORPORATE VIDEO
circles
 
   
  Duco

Continuous spooling of thermoplastic umbilicals from production facility to installation vessel via under roller systems.

duco

 
 
  Project Specifications
   
 
 
 
Project:
J994 – Conoco Phillips Ekofisk – Product Loadout

Workscope:
Spooling product quay to vessel via under rollers.

Location:
Shepherd Offshore – Offshore Technology Park – Walker - Newcastle

Shepherd Offshore Services Provided :
Internal transportation of equipment / Set up of spooling equipment & line / Mobile crane plant hire / Fabrication of seafastenings and fit spooling solutions to vessel e.g ramp / Material handling solutions reference spooling heavy & abnormal lifting services / Storage solutions.

  Agent:
Wellstream / Technip Norway

Vessel:
Fugro Saltire

Date / Time Arrival;
13:00hrs 17/8/09

Date / Time Departure;
16:20hrs 19/8/08

12hrs shifts / 24hrs a day
"The Fugro Saltire campaign is now successfully completed and vessel demobilised. The feedback from onboard personnel related to the loadout in Newcastle is that the services and personnel provided by Shepherds (welders, burners, fire watch, crane driver, forklift, quayside personnel) etc were provided at a professional and very efficient level showing a positive and pro-active attitude to participate in ongoing operations.
 
You satisfied the preparatory activities and planning carried in advance of the mobilisation and load out operations. Technip therefore look forward to work with Shepherd Offshore again on the next occasion."
Gustav Kibsgard, Technip Norway
   
 
 
  Privacy
Policy
Terms & Conditions Code of
Practice